Book Service

Find Your Next Step.

Popular places to start

Wilo SiBooster EXCEL Booster Pump Systems — representative manufacturer product

Representative manufacturer family image. Confirm the exact configuration in your quote.

Wilo

Wilo SiBooster EXCEL Booster Pump Systems

Packaged variable-speed pressure boosting for buildings; 2, 3 and 4 pump selections appear in the verified product table. Ask HTS for a replacement quote or a second opinion for your Toronto or GTA building.

Model / Family
SiBooster EXCEL pressure boosting systems
Project
Condo and commercial building assessment, repair review or replacement

Review the model. Compare the scope. Plan the next step.

Send the full nameplate and installation photos. Current supply, pricing and installation timing are confirmed in your quotation.

Wilo Building Pumps

Building Water Pressure Booster Options

  • Two-, three- and four-pump package examples
  • Variable-speed building pressure boosting
  • Exact Canadian electrical selection to be confirmed

Compare Your Repair Or Replacement Proposal

A SiBooster EXCEL proposal should identify the full package and the conditions it is selected for. Ask HTS to review incoming water pressure, building demand, standby capacity and the available electrical supply before approving the package.

Model Reference Guide

Wilo Pump Models And Series

Choose a model to ask HTS about your building.

Manufacturer model references. The complete code, electrical configuration and selected duty must be confirmed for your building.

Model / SeriesWhat To Confirm
SiBooster-2 EXCEL V20-14-1/4.3/VCE Part 3314114Two-pump selection
SiBooster-2 EXCEL V30-09-1/4.3/VCE Part 3314118Two-pump selection
SiBooster-2 EXCEL V50-05-1/4.3/VCE Part 3322238Two-pump selection
SiBooster-3 EXCEL V20-14-1/4.3/VCE Part 3322216Three-pump selection
SiBooster-3 EXCEL V50-05-1/4.3/VCE Part 3322245Three-pump selection
SiBooster-4 EXCEL V20-14-1/4.3/VCE Part 3322220Four-pump selection
Pump Replacement Selection

What To Consider Before You Change Your Booster Pump System?

  • Building design flow, minimum available incoming pressure and required pressure at critical fixtures.
  • Pressure zones, standby capacity, manifold size and working pressure.
  • The referenced US EXCEL data specifies 460 V three-phase power. Confirm a Canadian submittal and the building supply before selection, including any 575 V requirement.
  • Confirm potable-water certification of the exact package, controls and building-automation integration.

Send These Details For Your Second Opinion

  1. The building address and the pump’s location or system served.
  2. Clear pump, motor and controller nameplates, plus the current fault or symptoms.
  3. The proposed model and itemized replacement scope, if you already have a quote.
  4. Installation photos showing connections, controls and access.

We can discuss the proposed equipment and work with you. Hydraulic selection or unresolved faults may require a site assessment before a firm recommendation.

Explore Building Mechanical Maintenance

Download Wilo PumpTechnical Documents Here

Manufacturer literature and an HTS review of the proposed pump and installation scope.

Manufacturer Literature

Wilo North American booster systems brochure

Review the applicable model family, document revision and selected configuration with your quotation.

PDF
Keep Exploring

Compare Building Pump Options

View All Building Pumps
Pump Replacement Questions

Before You Approve A Pump Quote

Can HTS Review A Wilo Pump Replacement Quote?

A SiBooster EXCEL proposal should identify the full package and the conditions it is selected for. Ask HTS to review incoming water pressure, building demand, standby capacity and the available electrical supply before approving the package. Send the full equipment details and proposed scope to begin.

Is The Model Number Enough To Select A Replacement?

The full model number is a starting point. We also need the required flow and pressure, electrical supply, materials, controls and installation details. A matching horsepower or a similar family name does not establish an equivalent replacement.

Need A Second Opinion On Your Building Pumps?

Send the model and proposed scope. We’ll help you plan the next step.