Barnes Plumbing Solutions catalogue
Review the applicable model family, document revision and selected configuration with your quotation.

Representative manufacturer family image. Confirm the exact configuration in your quote.
Sewage and wastewater lift from building pits; series differ in impeller, discharge and solids capability. Ask HTS for a replacement quote or a second opinion for your Toronto or GTA building.
Review the model. Compare the scope. Plan the next step.
Send the full nameplate and installation photos. Current supply, pricing and installation timing are confirmed in your quotation.
A sewage ejector replacement involves the pump, its pit connection and the controls that start and alternate it. Ask HTS to review the complete Barnes designation and the scope for lifting, isolation and recommissioning.
Choose a model to ask HTS about your building.
Manufacturer model references. The complete code, electrical configuration and selected duty must be confirmed for your building.
| Model / Series | What To Confirm |
|---|---|
| 2SEV512L Part 104970 | 0.5 hp; single seal; 120 V / 1 phase |
| 2SEV522L Part 104971 | 0.5 hp; single seal; 240 V / 1 phase |
| 2SEV1022L Part 104982 | 1 hp; single seal; 240 V / 1 phase |
| 2SEV1522L Part 104187 | 1.5 hp; single seal; 240 V / 1 phase |
| 2SEV2022L Part 104190 | 2 hp; single seal; 240 V / 1 phase |
| 3SE514L Part 104892 | 0.5 hp; 1750 rpm; 120 V / 1 phase |
| 3SE1522L Part 132775 | 1.5 hp; 3450 rpm; 230 V / 1 phase |
| 3SEV512L Part 104992 | 0.5 hp; 3450 rpm; 120 V / 1 phase |
We can discuss the proposed equipment and work with you. Hydraulic selection or unresolved faults may require a site assessment before a firm recommendation.
Explore Building Mechanical MaintenanceManufacturer literature and an HTS review of the proposed pump and installation scope.
Review the applicable model family, document revision and selected configuration with your quotation.
Barnes
SP33 / SP50 / SP75 sump pumps
Groundwater and dirty-water sump duty with limited solids; building drainage locations where the verified pump curve and pit conditions fit.
Sulzer
ABS AS 0530–0841 wastewater pumps
Building wastewater, sewage and underground-garage drainage, subject to hydraulic and solids selection.
Sulzer
ABS Piranha S and PE grinder pumps
Sewage transfer through smaller-diameter pressure discharge lines; distinct from a conventional solids-passing ejector.
A sewage ejector replacement involves the pump, its pit connection and the controls that start and alternate it. Ask HTS to review the complete Barnes designation and the scope for lifting, isolation and recommissioning. Send the full equipment details and proposed scope to begin.
The full model number is a starting point. We also need the required flow and pressure, electrical supply, materials, controls and installation details. A matching horsepower or a similar family name does not establish an equivalent replacement.
Send the model and proposed scope. We’ll help you plan the next step.