Book Service

Find Your Next Step.

Popular places to start

CAMUS DynaMax commercial boiler — manufacturer product image

Representative CAMUS DynaMax boiler. Appearance varies by size and configuration.

CAMUS Commercial Boilers

CAMUS DynaMax Commercial Boiler

Smaller commercial heating loads and multiple-boiler plants, with separate water-heating and combination versions. Ask HTS about boiler replacement, installation and service for your Toronto or GTA building.

Model / Family
DynaMax
Project
Condo and commercial building boiler replacement or service

Boiler Quotes For Toronto & GTA Buildings.

Send your boiler nameplate and project details. Equipment selection, supply, pricing and installation timing are confirmed in your quotation.

CAMUS Boiler Systems

DynaMax Boiler Replacement Options

A compact stainless steel condensing family with wall and floor configurations for smaller commercial heating loads and modular installations.

  • Stainless steel counter-flow watertube heat exchanger.
  • Modulating combustion with a 5:1 turndown ratio.
  • Integrated controls support a cascade of up to eight units.
Published Model References

CAMUS DynaMax Boiler Models

Select a model to include it in your enquiry.

Heating size codes and maximum inputs follow submittal 99-0201 Rev.01. Wall models are 0201 and 0251; the remaining listed sizes are floor models. The family manual identifies DMH heating, DMW water-heater and DMC combination models. Confirm the complete order code. MBH means thousands of BTU per hour. Input is fuel input, not delivered heating output.

Model / Size ReferenceInput (MBH)Selection Notes
DMH201199Wall mount; heating. Base identifier shown; final option suffixes vary. Published size: 0201.
DMH251250Wall mount; heating. Base identifier shown; final option suffixes vary. Published size: 0251.
DMH211199Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0211.
DMH261250Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0261.
DMH291299Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0291.
DMH391399Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0391.
DMH501500Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0501.
DMH601600Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0601.
DMH701700Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0701.
DMH801800Floor mount; heating. Base identifier shown; final option suffixes vary. Published size: 0801.
Commercial Boiler Selection

What To Consider Before You Change Your CAMUS Boiler?

  1. Useful to assess for smaller plants or multiple-boiler arrangements after calculating the building load.
  2. Confirm the wall/floor layout, venting and whether heating-only, combination or water-heating construction is required.
  3. Review building heating demand, supply and return temperatures, required flow and plant staging before choosing replacement capacity.
  4. Confirm the complete equipment order code, fuel, electrical supply, venting, piping, controls and service access.
  5. Include removal, planned service interruptions, commissioning and final equipment documentation in the installation scope.

What Should You Send For A Boiler Quote?

Include the building address, existing boiler and burner nameplates, installation photos, service history and the reason for the proposed work. Share mechanical drawings or the required heating load if available. HTS can help define the assessment, replacement selection and installation scope.

Explore Boiler Repair & Maintenance

Download CAMUS BoilerTechnical Documents Here

Model literature to help plan your boiler replacement or service enquiry.

Manufacturer Literature

DynaMax heating submittal — 99-0201 Rev.01

Review the published model ratings, dimensions and installation requirements for the selected boiler.

PDF
Manufacturer Literature

DynaMax brochure — Rev.03

Review the published model ratings, dimensions and installation requirements for the selected boiler.

PDF
Manufacturer Literature

DynaMax installation and service manual — 99-0416 Rev.00

Review the published model ratings, dimensions and installation requirements for the selected boiler.

PDF
Keep Exploring

More CAMUS Boiler Options

View All Commercial Boilers
Toronto & GTA Building Boilers

Boiler Replacement & Service Questions

Can HTS Help With CAMUS DynaMax Boiler Replacement?

Send the existing equipment details, building address and project requirements. HTS can discuss a site assessment, the proposed boiler and the work required for removal, installation and commissioning.

Does A Similar Model Number Confirm A Direct Replacement?

No. Model references help identify a family or size. Confirm the full order code, fuel, heating duty, water temperatures, venting, connections, controls and installation requirements before selecting replacement equipment.

Need A New Boiler For Your Building?

Contact HTS with your boiler model and building details. We’ll help you plan the next step.